18. Building Works18.1 GeneralThe General Conditions, Tender Drawings, relevant Specifications On materialsand workmanship described elsewhere in this Documents, Schedules shall be readin conjunction with this Specification.18.1.1 Contractor's ResponsibilitiesThis is a turnkey contract which includes all building works and services. TheTender shall cover all requirements of the Tender Documents and any other itemsnot specifically mentioned but which are deemed to be necessary for the completeexecution of the Works to the entire satisfaction of the Board. No additional costwill be considered for any item which the Contractor has over looked but areessential for the full completion of the Project in every respect.The Tender shall include the building works proposal complete with out-linedrawings indicating any variation or improvement which he deems technically orfinancially justified for the works mentioned in the Tender Document, schedule ofmaterials and finishes on which the tender has been based. The Building shallgenerally conform to the sizes shown below & as per approval of the Board.The Contractor shall be responsible for all performance in the detailed design,supply of material, labour, plants and equipment, construction and relevant worksincidental to the completion of the Building Works.The Contractor shall perform the Works thoroughly in accordance with the agreedconstruction schedule and direction to be made by the Board during the ContractPeriod.18.1.2 Building Sub-ContractorThe Contractor may employ a building subcontractor for building works. If theContractor intends to subcontract the building works design and/or construction,his tender shall include full details of comparable works carried out elsewhere bythe subcontractor, together with details of the financial stability and generalefficiency of the proposed subcontractor.18.1.3 Construction ScheduleA preliminary building construction schedule showing the completion time for thebuilding works shall be submitted by the Tenderer based on the overall projectimplementation schedule. The Contractor shall prepare and submit to the Boardfor approval a detailed construction schedule for the building works developedfrom the preliminary building construction schedule before commencement of theWork on the Site. The approved construction schedule shall not be altered withoutthe written consent of the Board.Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)191

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!