19. SPARE PARTS19.1 GENERALThe Contractor shall guarantee that the spare parts shall be available during thelife time of the plant.Spares during Warrantee periodThe Contractor shall submit a list of Essential spare parts with OEM Part No. andconsumables to be necessary for maintenance of the unit(s) and other plantequipment inclusive of emergency use that takes place in the course of operation(according to the Manufacture's recommendation and guideline) during theWarranty period (24 months). During the warranty period of 24 months, theContractor shall supply all necessary equipment, spare parts,materials/consumables etc. at his own cost and whether it is listed or not in theirlist. In preparation of the list the tenderer have to consider plant factor as 80%.Spares during Long Term Service agreement (LTSA)The Tenderer shall, in addition to essential spare parts and consumables forwarrantee period also submit a list of spares for LTSA period (next 4 years afterwarrantee period) which reflects the OEM's guidelines and Tenderer's experiencein the operation and maintenance of the type of equipment proposed. For LTSAperiod also the Contractor shall supply all necessary equipment, spare parts,materials/consumables etc. at his own cost and whether it is listed or not in theirlist. In preparation of the list the tenderer have to consider plant factor as 80%.Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)210

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!