12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8.10.3 CONTROL EQUIPMENT(1) TransmittersIndicating transmitters shall be provided for control loops as required.Transmitters shall be substantially unaffected by changes in temperature and inprocess static pressure over a range from zero to twice the normal operatingpressure. Transmitter shall feature accessible zero. and span adjustment.(2) Final Control ElementsControl valves and damper actuators shall be pneumatic, where necessary,provided with electric- to-pneumatic converters. The response of final controlelements shall have minimum time lag.a. Control ValvesControl valves rated at 2,00 kN/ sq.m (300 lbs ASA) and below shall be flangedand higher rating shall be welded. Valves shall with stand shock loads imposed bythe processor. control valve actuators shall be sized to overcome packing frictionand dynamic stem forces. Unbalanced force shall be kept to a minimum levelconsistent with efficient operation in service.b. Damper ActuatorsDamper actuators shall be fully enclosed and supplied with all accessoriesincluding special mounting brackets if required. A solenoid operated, four waypneumatic valve plus open and close limit switches shall be included.(3) RecordersThe recording instruments shall be of the multi or single point strip chart type.Circular chart recorders shall not be used. The recorder shall display the previousfour hours. Roller type charts shall have a duration of 30 days as minimum. Thewhole of the recording mechanism shall be withdrawable from its case from thefront for maintenance.Micro-processor based recording and data acquisition system with printer alsomay be provided.Positioners and E/P Converters(4) Positioners shall be furnished with final control elements where:- small change in pneumatic signal are to be amplified- Split range control is required- valve pressure drop is greater than 280 kN/sq.mPositioners shall have a feedback cam to characterize relationship between inputsignal and final element position.E / P converters shall be provided to convert electronic control signals topneumatic output signals. Converter accuracy shall be plus / minus 0.5% ofoutput span.Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!