12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

c. Stranded Conductors for Overhead Line and Grounding System- General inspection- Tensile strength testd. Other Materials-General inspection16.2.6 CONTROL AND PROTECTION SYSTEMThe following tests for the control and protection system shall be performed atthe workshop.- General inspection- Measurement of insulation resistance- Dielectric withstands voltage test- Performance test of relay Error test of meter- Sequential operation test of Control & Protection System.16.2.7 OTHER MATERIALS AND EQUIPMENTAll other materials and equipment shall be tested at the Contractor's workshops inaccordance with latest IEC, ISO, other approved international Standard and/or therequest of the Board.16.3 TESTS AT SITEResponsibility for Testsa. The Contractor shall conduct the tests at the Site in accordance with theseclauses and the conditions of the Contract.b. The Contractor shall provide all equipment and personnel required to carry outthe tests, including the provision, installation and removal of all test instruments,the connection and disconnection of plant items and obtaining of all records. TheBoard will provide electricity, fuel and water required for the tests on completionwithout charge to the Contractor.c. The Contractor shall prepare and submit to the Board at least three monthsprior to the commencement of testing, schedules in approved format for each testtogether with a programs provided by all Contractors.The Board & the Engineer will be responsible for overall co-ordination and safetycontrol of tests.d. The Contractor shall submit one copy of the results of each of the tests at theSite to the Project Director within one week of the tests being carried out. Fourcopies of the certificates shall be provided to the Board within one month of thetests being carried out.e. The <strong>BOARD</strong>'s staff will observe and participate in the tests on completion.f. The Contractor shall submit evidence to the Board that the instruments used forthe tests have been calibrated at an approved testing laboratory within a period ofGhorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)144

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!