12.2 Liquid Fuel Handling systemThe contractor shall design, manufacture, inspect, test, deliver to the site andinstall of liquid fuel oil handling, conditioning and regulating facilities with allaccessories as specified hereunder for the plant.The unit shall be furnished with a complete liquid fuel oil system. The liquid fueloil handling system shall also be provided.12.2.2 Fuel forwarding skidFuel forwarding skid brings liquid fuel to the gas turbine at a pressure consistentwith the gas turbine fuel supply requirements.Equipment list:-Two (2) 100% fuel forwarding AC motor driven centrifugal pumps (one duty, onestandby), each for the maximum fuel flow necessary to the gas turbine-Three suction Strainers-One fuel pressure regulating valve-One relief valve-Complete set of piping including valves, gauges and fittings of all linesterminating at the skid boundary12.2.3 Fuel oil filters SkidThis unit provides liquid fuel filtration up-stream the unit turbine and includes thefollowings:-Two fuel filters (one duty, one standby) : Filter cartridge -5 microns-One pressure metering panel board including : one manostat (fuel pressurecontrol), one different pressure gauge-One fuel accumulator-One stop valve-Complete set of piping including valves, gauges and fittings of all linesterminating at the skid boundary12.2.4 Fuel storage tankThe fuel storage tank is a vertical with fixed roof tank. Its capacity of each Tankshall be minimum 50.00 lac litre if existing tanks are not serviseable. The fuelstorage tank will be assembled in site and includes the followings:-One fuel inlet flange-One fuel outlet flange with floating suction-Two manholes located in shell and in roof-Two foam chambers for fire protections-One visual level gauge-Various levels switch to provide alarm at subsequent level-one gas vent-One water drain-One spiral stairway and one top peripherical handrailing12.2.5 Unloading Fuel skidRequired piping, along with, other facilities that will be required for the systemGhorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)115

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!