materials/consumables etc. at his own cost and whether it is listed or not in theirlist.Spares during Long Term Service agreement (LTSA)The Tenderer shall, in addition to essential spare parts and consumables forwarrantee period also submit a list of spares for LTSA period (next 4 years afterwarrantee period) which reflects the OEM's guidelines and Tenderer's experiencein the operation and maintenance of the type of equipment proposed. For LTSAperiod also the Contractor shall supply all necessary equipment, spare parts,materials/consumables at his own cost and whether it is listed or not in their list.2.19 Special Maintenance ToolsThe contractor shall provide all special tools including a boroscope set required formaintenance of the unit and hand them over in good condition to the <strong>BOARD</strong>. Alist of all such tools shall be incorporated with tender. Contractor shall not bepermitted to use any equipment/ machinery/ tools, which are to be suppliedunder the Contract.2.20 Office equipmentThe Contractor shall provide 3(three) Nos of Computer (latest model), each withLaser Printer, UPS (30 Minutes at full load, Min.), Stabiliser, Standard Tables &Chairs etc.2.21 Electrical workshop toolsCurrent injection test set, Megger, Multimeter, etc.2.22 Machine Shop equipment & Tools - DeletedLathe, Piller drill, Universal miller, Machine hacksaw, Grinding Machine,Small universal machine tools, Welding set etc.Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!