12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

to suit. Stud shall be formed of approximately 0.03 gauge cold rolled steel withprepunched holes in the web 120 mm on centre to allow horizontal passage ofutility lines. Studs shall be spaced 1000 mm on centre with horizontal spacerchannels and framing materials.Glass panel framing shall be anodised aluminium with glazing recess. Glazing shallbe 6 mm clear sheet glass fitted with neoprene or vinyl gaskets.The Contractor shall submit samples of metal and drawings showing details ofconstructions for approval of the Board.18.6 Painting18.6.1 MaterialsAll paint distempers and other materials shall be of an approved brand or brandsand shall comply with JIS Standard or other, equivalent standard to be approvedby the Board. Paint for use on concrete or brickwork shall be of a type speciallyprepared for this purpose. Each coat shall be of a distinct colour from thepreceding one and all colours shall be approved by the Board. Mixed paint andsynthetic resin emulsion paint shall be applied based on the following method(unit: kg/sq.m)Mixed paint Synthetic resin emulsionMetal Wood Concrete BrickFirst paint(Rust inhibitive paint) 0.14 0.09 0.13Second paint 0.08 0.11 0.13Finishing paint 0.04 0.09 0.13Note: Rust inhibitive paint shall be either red lead or zinc rich lead type.For painting of structural steelwork, see Section of 18.5.1(7).18.6.2 Surface PreparationPrior to painting, the dust, grease, injurious adherent substance, rust shall beremoved from the surface to be painted. The planed grain, interlocked grain, fluffin wood shall be ridded with sandpaper and all cracks, manholes open; duct andother imperfection shall be made good with hard stoppings consisting of pastewhite lead and gold size stiffened with whiting. Cracks and holes on the concretesurface shall be flattended with cement paste, mortar, or cement filler.18.6.3 WorkmanshipAll painting and decoration shall be carried out by skilled workmen according tothe best current practice in accordance with manufacturer's instructions.All materials shall be applied by brush unless otherwise specified or approved.Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)206

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!