12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FrameRoofExterior wallPartition wallFloor: Reinforced concrete: Reinforced concrete roof withlime concrete water proofing.: Reinforced concrete and/or brick.: Brick: Concrete with plastic tile, ordinarytile, trowelled mortar finish, etcFoundation: The Contractor shall examine subsoilcondition for design of foundation. Properfoundation shall be designed by theContractor in accordance with theSpecifications(2) Windows:Aluminium sash shall be provided. Window area shall be generally more than 1/10of the room floor area unless otherwise indicated. All windows except toilet, store,and cable spread mg room windows shall be fitted with sun blinds of approvedmade.(3) Machines and utilities:Air conditioning system, ventilation system, water supply system, power supplysystem, drainage system, sanitary system and lighting system shall be provided.(4) Finishes and room sizes:The Contractor may submit the layout to suit any particular requirement subjectto the approval of the Board.(5) Other Requirement:a. Control room : Noise level shall be kept to avalue less than 45 db(A).b. Toilets : Toilets shall be providedwith sanitary fittings as follows:WaterclosetUrinalWashbasin with hot and cold waterand mirrorGround floor 2 2 1First floor 1 1 1Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)194

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!