12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.3.2.8 Air Inlet SystemThe air filtration arrangement shall be multi stage (pre-filter and high efficiency).Brief technical specification:a) One filtration unit for compressor air intake of Gas Turbine.b) Flow rate :c) Pressure droop : clean: 38mm water anddirty :76 mm water.d) Filter type :Pre-filter: WashableHigh efficiency filter : Disposablee) Cartridges/each filter :f) Filter media : water resistant, synthetic.The bidder shall supply 1 filter unit for Gas Turbine complete in all respectsincluding necessary supporting structures, holding frames, fasteners, pressureswitches, gauges etc. whichever are necessary. The bidder shall also submitnecessary design documents and drawings for this filtration system.Each air inlet system shall be provided with silencer if required capable of keepingthe sound pressure level as required by environmental regulations whenmeasured at a distance of 100 meter from the plant operating at full load as perISO standard.3.2.2.9 Exhaust SystemThe gas turbine unit shall be equipped with an exhaust duct and a suitable stack(height should meet the environmental protection requirement but not less than30 m). The exhaust system shall have a silencer to reduce the sound level asrequired by environmental regulations when measured at a distance of 100 meterfrom the plant when operating at full load.The duct shall be supplied complete with all necessary expansion joints thermaland acoustic insulation, manholes, drains, supports, bolting and jointing. It shallbe arranged in such a way that normal maintenance can he carried out on anycomponent without dismantling the duct.The Emission levels of exhaust have to be within the limit of environmentalprotection regulations.3.3.2.10 Unit EnclosureExcept as otherwise specified, all equipment shall be enclosed in a minimumnumber of prefabricated metal enclosures. The enclosures shall be constructed ina neat and workman like manner and shall present an attractive appearance.Enclosures shall be weather proofed and shall for wind loading of 100 miles /hour.Enclosures shall be designed to permit easy accessibility to the equipment and toGhorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!