12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

- Ammeter with selector switch :One(1) set- Protective relays :One (1) set- Control switch, etc. :One(1) lot2) Voltage Transformer Cubicle- Voltage transformer :One (1) three phase unit- Under voltage relay :One (1) unit- Voltmeter with selector switch :One (1) lot4.4 6.6 Kv Common Switchgear4.4.1 GeneralThe common switchgear shall be fully metal clad arrangement for local andremote operation, and shall comprise the following cubicles:- Incoming circuit breaker cubicle for the unit auxiliary transformer.- Outgoing power fuse switch cubicle to station transformers.- Voltage transformer cubicle.- Outgoing circuit breaker cubicles to starting motor, GBC motors etc.The circuit breaker shall be of SF 6 gas or vacuum type.The circuit breaker shall comply with the requirements of IEC 56 and the relevantrequirements of these Specifications.All circuit breakers shall be identical in arrangement and shall be interchangeable.4.4.2 Type And Rating1) The switchgear shall be of the metal clad type and shall comply with thestandard given below and with the relevant requirement stated in theSpecification.IEC 298IEC 85IEC 51AC metal enclosed switchgearInsulation materialElectrical Indicating Instruments2) The switchgear busbar and associated connections shall have theinsulation levels as given below:System highest voltage : 7.2Withstand voltageLighting (impulse)(11.2/50micro sec.)Power Frequency (rms.)(For 1 mm.): 60 KV (peak): 22 KVGhorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!