8.4.2 GAS TURBINE GENERATING UNIT REMOTE INDICATIONThe following remote indications shall be provided, but not be limited to, on theremote unit control panel.a. Ready to startb. Auxiliaries runningc. Normal start sequence in progressd. Start sequence completede. Shutdown sequence in progressf. Generator breaker open / closeg. Flame indicationh. Temperature control indicationi. Fuel selection Liquid Fuel / Gasj. Mode selection indication base / peakk. Generator operating model. All trip cause.8.4.3 REMOTE METERINGThe following metering instruments shall be provided, but not be limited to, onthe remote unit control panel.a. Generator active power outputb. Generator reactive power output ( MVar)c. Generator Power Factorc. Generator bus voltaged. Speed indicatore. Generator coolant and stator temperature (deg. C)f. Generator frequencyg. Generator stator currenth. Filed current and voltage (A and V)i. Averaged exhaust temperature ( deg. C)8.5 LOCAL CONTROL AND INSTRUMENT PANEL FOR GAS TURBINEGENERATING UNITThe local control panel shall be installed near the associated auxiliary equipment.The type of the panel shall be decided depending on the installed locations.(1) Local Control Panela. Indoor type panelIt shall be of steel made totally enclosed, front door type. Operation indicatinglamps, operating switch, name plate, etc. shall be fitted on the front door.b. Outdoor type panelIt shall be of steel made totally enclosed weatherproof type with double frontdoor. Operation indication lamps, operating switch, name plate, etc. shall be fittedon the inside door so as to prevent them getting wet on rainy days. The outsidedoor shall be with glass window so that the instruments fitted on the inside doorGhorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)83

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!