12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

the latest specifications and provisions of approved Standards of the EngineeringInstitutes or other equivalent standards approved by the Board.One deep-well pump shall be installed for each well.(2) Instruction BookThe Contractor shall submit ten (10) copies of instruction books on the operationand maintenance of equipment furnished and installed by him under this clausetwo (2) months before he starts on the installation work.(3) PaintingAll metal, wooden and textile surfaces of materials furnished and installed by theContractor under this Section shall be painted in accordance with Section 18.6,except as listed below. Performance of painting work shall be as specified in theSection 18.6 of the Specifications.a) Portions to be embedded in concrete or in the soilb) Plated surfaces other than zinc platingc) Concealed zinc plated portionsd) Surfaces treated with special decorative finishese) Surfaces where so indicated by the BoardColour of paint shall be as directed by the Board.(4) Concrete, Plastering and Earth WorkConcrete, reinforcing, plastering and earth work to be executed under this clauseshall be performed according to the applicable provisions of the relevant clausesof the Specifications.17.10.5.2 Drilling, Developing And Testing The Deep-well(1) GeneralThe Contractor shall provide plant, labour, material, equipment and perform alloperations in connection with the drilling, developing, placing of casings and wellscreens, and pumping tests for the deep-well which shall be drilled to a depth asindicated below.(2) DrillingDrilling of the deep-well shall be carried out by an appropriate method mostsuited to the conditions of the deep-well site to be drilled. When necessary,temporary casings shall be used in sections of the hole through over burden orunstable material to prevent the caving-in of the well. The location of the welldrilling site shall be as shown on the bid drawings or as directed by the Board.(3) Well LogGhorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)183

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!