12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

intentional or national standards and codes of practice [BNBC]. The adoptedstandards or codes shall be consistent throughout any section of the works unlessotherwise specified. The Contractor shall have full responsibility to investigate theexistence of any decrees and local bylaws governing the proposed works and tofully comply with such requirements which are effective when the date of tendersubmission.As described elsewhere in the documents the Contractor shall indicate in histender standards and codes to be conformed in design and construction of theWorks. Copies of these codes and standards shall be made available to the Boardduring the design and construction period.a. Basic design conditions for buildings are outlined as follows:-Design wind speed: 100 miles/hr.Seismic horizontalground acceleration : 0.10g- Ditto - (vertical) : Nilb. Live load of each floor shall be more than as follows : -Auxiliary roomCable spreading room: 500 kg/sq.m: ditto18.3.3 Submission Of Designs And DrawingsThe Contractor shall be required to produce full design calculations for thefoundations, building structures, and detailed working drawings and reinforcementbar bending schedule etc. Design calculations shall be prepared in accordancewith an approved method of computation based on the most unfavourablecombination of dead load, live load or crane load and wind load. The Contractorshall be responsible for the detailed design, strength and safety of the structures,and ensuring that the design satisfies the requirements of all authorised local andinternational bodies.Design calculations and detailed drawings shall be submitted to the Board forapproval in accordance with the requirement set out in Section 18.3.1 of theTender Documents. Construction on the Site shall only commence after drawingsare finally approved.Notwithstanding the Board's approval, the Contractor shall be held responsible forthe accuracy of his submitted information, designs and drawings.18.4 Building And Services18.4.1 Control Room BuildingConstruction Control Room Building(1) Main construction materialsGhorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!