12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.3.2 Gas Turbine And AuxiliariesThe gas turbine generating unit shall be of the simple cycle heavy-duty industrialpackaged type suitable for outdoor installation and operation under the siteconditions as specified in Clause B1 of schedule-B.Vibration Critical SpeedThe radial amplitude of vibration of any rotating shaft under steady stateconditions at normal operating speed shall not exceed the value specified in APIStandard 616 when measured at the shaft local to the bearing. The critical speedshall be beyond ± 20 % of the operating speed of the engine.All compartments in the gas turbine generating unit shall be accessible forinspection and maintenance.The gas turbine unit shall be designed to burn Liquid fuel as well as natural gas asspecified.The unit shall be capable of frequent starts and stops without damage to the hotgas path components and shall be able to run for base load.3.3.2.1 Starting SystemThe gas turbine shall have electric motor driven starting equipment capable ofsustaining the complete starting cycle. The starting motor shall be capable ofcarrying out at least Five (5) consecutive starting without any harmful effect.3.3.2.2 Turning GearA rotor turning gear shall be provided to minimise thermal distortion of the rotorafter operation and to permit rapid reloading of the unit after a shutdown.Necessary oil piping and appurtenances shall be included. Turning gear oil pipingsystem shall be a part of the turbine lubrication system and shall be completewith all necessary pressure switches or other interlocks to prevent turning gearoperation if lubricating oil pressure drops below than pre-set value. Suitablehousing and safety guard shall be provided for all moving parts of the turninggear. Turning gear operation shall be indicated on the remote control panels. Theturning gear shall have automatic engaging and disengaging mechanisms.Additional arrangement for hand turning shall be provided for use in case theautomatic turning system fails to operate.3.3.2.3 Load Gear and Accessories Drive GearThe turbine shall be equipped with good quality and suitable load gear equipmentof proper rating if required to match the generator speed for 50 Hz generation.Load gear shall be totally enclosed and be equipped with forced lubricating deviceto the gear.The turbine shall also be equipped with suitable accessories driven gear unit.Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!