12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Over excitation limiter and under excitation limiter shall be provided.4.2.2 Automatic Voltage Regulator (AVR)A quick response continuously acting regulator having a negligible dead-band andcharacteristics enhancing the transient stability of the generator shall be provided.The regulator shall be responsive to the generator line-to-line voltage and shallrestore the exciter output voltage to range of plus / minus 2% of the nominal presetlevel in a response time of less than 50 milliseconds. The accuracy ofcontrolling the AVR shall maintain the generator terminal voltage within plusminus0.5 % of the pre-set value for gradual change of output within the specifiedload range of the machine. It shall have the capability to adjust the generatorvoltage between a minimum of 80% of rated voltage (open circuit) and amaximum of 110%of rated voltage (full load).The regulator shall be equipped with devices which will provide compensating oroverriding signals to the regulator in response to the following conditions.a. Excessive exciter output current in the event of fault in the field circuit.b. Pole slip due to reverse induced field voltages.c. Under excited reactive current in excess of generator capability limitsd. Voltage drop due to generator reactance.e. Dynamic variation of generator output.Manual control shall be provided to set the generator terminal voltage between0% and 110% of the rated voltage.Automatic change-over from Auto to Manual system shall be provided in case ofabnormal/faulty PT Voltage.4.3 11 Kv Generator Switchgear4.3.1 GeneralThe generator circuit breaker shall be provided, and it shall be accommodated inmetal clad switchgear cubicle arranged for local and remote control.The switchgear and the associated equipment shall be fully metal clad andshall comprise:-- Switchgear bus bar- Voltage transformers- Current transformers- Surge protective equipment- Generator circuit breaker- Power fuse switch for station transformers- Cable termination facilities for 11 KV circuitGhorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!