4.1.7 Generator LeadsThe neutral and output ends of each phase windings shall be brought out to thegenerator terminal cubicle.The generator neutral shall be grounded through suitable transformer withsecondary resistor.The connection between generator terminal and 11 kV generator switchgear &Unit transformers shall be 11 kV Isolated (insulated) phase bus duct.4.1.8 Bearing4.1.9 RotorBearings shall be pressure lubricated by pressured oil from the gas turbinelubricating oil system, and oil drain pipes shall be equipped with pockets forthermometer and suitable sight flow opening for observing bearing oil flow.The packing blocks used especially in the rotor winding shall be of approvedmaterial and entirely suitable for the high temperatures and mechanical forceswhich may cause on rotors.The rotor slot insulation shall be mainly of epoxy resin or other approved materialand particular attention shall be given to the insulating and securing of coil to coiland slip ring connections, if any, and to avoid vibration and the possible failure toeither the connector or its insulation.Adequate precautions shall be taken against local overheating of the rotor surfacewhen neutral short circuits and single phase loading and the Contractor shallsubmit data showing permissible single phase and unbalanced three phaseloading. The rotor shall be capable of withstanding an over-speed test of 1.2times rated speed for two minutes.If slip-rings are provided, a grinder for slip-ring maintenance shall be supplied bythe Contractor.4.1.10 Temperature DetectorsMore than nine (9) resistance type detectors shall be provided for monitoring ofgenerator stator winding temperatures. The detectors shall be built into thegenerator, fully protected from the cooling air, suitable distributed around thecircumstances, and embedded in the slots in positions normally having the highesttemperature in accordance with requirements of IEC standards. All detectors shallbe wired out to a terminal box.4.1.11 Insulation Against Shaft CurrentOne of the bearings shall be suitably insulated to prevent flow of shaft current.Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!