(3) Current TransformersThe test shall be performed in accordance with the latest revisions of IEC 185"Current transformers".- General inspection- Polarity test- Insulation resistance measurement- Dielectric withstand voltage test- Characteristic test(4) Voltage TransformersThe test shall be performed in accordance with the latest revisions of IEC 186"Voltage transformers”- General inspection- Polarity test- Insulation resistance measurement- Dielectric withstand voltage test- Characteristic test(5) Lightning ArrestersThe test shall be performed in accordance with the latest revisions of IEC 99-1"Lightning arresters, Part 1: Non-linear resistor type arresters for AC system".- General inspection- Power frequency spark-over voltage test- Lightning impulse spark-over voltage test- Measurement of leakage current and insulation resistance(6) Steel StructuresGeneral inspectionMaterial quality and quantity check(7) Bus Support, Insulators and Wiring MaterialsThe following shop tests shall be performed by sampling inspection method andnumber of samples for the test shall be decided after award of the Contract.a. Bus Supports- General inspection- Dielectric test of power frequency- Tension proof testb. Insulator Assemblies and Grounding Wire Attachment- General inspection- Dielectric test of power frequency- Breakdown test of insulator- Dimension measurement of hardware- Tension proof testGhorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!