5.2.4 WINDING AND INSULATIONThe full installation shall be applied on both 230 KV (phase & neutral) and 11 KVwindings and neutral point of 230 KV windings shall be solidly grounded.The winding conductors shall be of high conductivity copper.The insulation shall be designed not merely by normal voltage per turn, but alsoby variation of line voltage and the operating conditions including impulse surgecaused by lightning strokes on the transmission line and switching surges.5.2.5 ON LOAD TAP CHANGERThe on load tap changer shall be provided on neutral side of 230 KV winding andshall be designed to meet the requirement of IEC 76. OLTC shall be of MR,Germany or ABB, Sweden only. Provisions shall be made for padlocking in any tapposition.5.2.6 CABLE BOX/Isolated & Insulated Phase Bus DuctThe cable box shall be provided on each transformer so as to cover the 11 KVterminals and 11 kV power cables down to ground surface. Proper cable supportsand cleats shall also be provided.Isolated and Insulated Phase Bus Duct shall be provided from Generator terminalto Generator circuit breaker and Generator circuit breaker to LV side of UnitTransformers.5.2.7 PHASE & NEUTRAL CIRCUIT CURRENT TRANSFORMERCurrent transformer shall be provided on the high tension neutral circuit forRestricted Earth Fault & Stand by Earth Fault relays and ratio should match withphases (LV & HV) Differential protection circuit. If necessary Inter-posing currenttransformers may be used.1) Use : Protection2) RatingsRated primary currentRated secondary currentAccuracy classRated burden: 400 - 800 A(depends on rating of transformer): 1 A: 5 P20:15 VA3) Requirements for characteristics and ConstructionThe current transformer shall be designed to meet the requirements of latest IECstandard.Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!