16. TESTS AND INSPECTIONS16.1 General16.2 Workshop Test16.2.1 Gas Turbine16.2.2 Generator16.2.3 Exciter16.2.4 Step-up Transformer16.2.5 230 kV Switchgear Equipment16.2.6 Control and Protection System16.2.7 Other Materials and Equipment16.3. Tests at Site16.3.1 Tests and Completion16.3.2 Field Inspections and Tests on Gas Turbine Units16.3.3 Field Inspections and Tests on Switchgear Equipment16.4. Acceptance and interim Operation16.5. First Inspections16.5.1 Responsibility During Guarantee Period16.5.2 First InspectionPageGhorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)139