3 • THE BASIC PROCESS PANEL<br />
PROMPTS<br />
Prompt<br />
Name<br />
Type<br />
Capacity<br />
Schedule Name<br />
Schedule Rule<br />
Busy/Hour<br />
Idle/Hour<br />
Per Use<br />
StateSet Name<br />
Description<br />
The name of the resource whose characteristics are being<br />
defined. This name must be unique.<br />
Method for determining the capacity for a resource. Fixed<br />
Capacity will not change during the simulation run. Based on<br />
Schedule signifies that a Schedule module is used to specify the<br />
capacity and duration information for the resource.<br />
Number of resource units of a given name that are available to<br />
the system for processing. Applies only when Type is Fixed<br />
Capacity.<br />
Identifies the name of the schedule to be used by the resource.<br />
The schedule defines the capacity of a resource for a given<br />
period of time. Applies only when type is Schedule.<br />
Dictates when the actual capacity change is to occur when a<br />
decrease in capacity is required for a busy resource unit. Applies<br />
only when Type is Schedule.<br />
Cost per hour of a resource that is processing an entity. The<br />
resource becomes busy when it is originally allocated to an entity<br />
and becomes idle when it is released. During the time when it is<br />
busy, cost will accumulate based on the busy/hour cost. The busy<br />
cost per hour is automatically converted to the appropriate base<br />
time unit specified within the Replication Parameters page of the<br />
Run > Setup menu item.<br />
Cost per hour of a resource that is idle. The resource is idle while<br />
it is not processing an entity. During the time when it is idle, cost<br />
will accumulate based on the idle/hour cost. The idle cost per<br />
hour is automatically converted to the appropriate base time unit<br />
specified within the Replication Parameters page of the Run ><br />
Setup menu item.<br />
Cost of a resource on a usage basis, regardless of the time for<br />
which it is used. Each time the resource is allocated to an entity,<br />
it will incur a per-use cost.<br />
Name of states that the resource may be assigned during the<br />
simulation run.<br />
47