Table of Contents - Covidien
Table of Contents - Covidien
Table of Contents - Covidien
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Self tests (SST and EST)<br />
Caution<br />
To ensure accurate SST and EST operation, run SST and EST in<br />
room air (% O2 is 21%) after the ventilator has been powered<br />
on for at least 10 minutes. (EST also requires an oxygen<br />
supply.)<br />
<strong>Table</strong> 4-1 describes SST and EST.<br />
<strong>Table</strong> 4-1: 700 Series Ventilator self tests<br />
Test name Purpose When test is run<br />
Short self<br />
test (SST)<br />
Extended<br />
self test<br />
(EST)<br />
An abbreviated version <strong>of</strong> EST to<br />
be run primarily by the operator.<br />
Makes detailed checks <strong>of</strong> the<br />
pneumatics and electronics. It also<br />
characterizes system leaks and<br />
system/tubing compliance to<br />
compensate during breath<br />
delivery. POST is run as part <strong>of</strong> SST.<br />
Thoroughly tests the operational<br />
integrity <strong>of</strong> the ventilator, both<br />
the electronics and pneumatics.<br />
POST and SST are part <strong>of</strong> EST.<br />
Before patient is<br />
connected to the<br />
ventilator or after<br />
ventilator breathing<br />
circuit or humidifier is<br />
changed.<br />
• When the ventilator<br />
is serviced.<br />
• As part <strong>of</strong> the<br />
ventilator<br />
performance<br />
verification.<br />
• Following a ventilator<br />
inoperative.<br />
NOTE:<br />
The performance verification, described in the 700<br />
Series Ventilator System Service Manual, is a more<br />
thorough test <strong>of</strong> the ventilator to verify specifications<br />
are met. The technician runs a partial or full<br />
performance verification after servicing the ventilator<br />
and at regular intervals.<br />
4-2 10066984 Rev. D 700 Series Ventilator Operator’s Manual