Case Study #2 259<br />

replaced <strong>and</strong> cracks in the combustor were field repaired.<br />

It is necessary to point out that the two machines operate in a<br />

very polluted environment. Traces of the lead, zinc <strong>and</strong> natrium were<br />

found in the gas turbine compressors during the Major Inspection.<br />

Furthermore, ABB Field Service personnel have observed, on occasions,<br />

that implosion doors of the air inlet plenums were found to<br />

be opened by operators during the plant operation. The subsequent<br />

metallurgical analysis of the damaged parts indicated that the rapid<br />

<strong>and</strong> frequent change of fuel quality is also contributed to the damages<br />

<strong>and</strong> cracks in the combustor.<br />

The spare parts <strong>and</strong> maintenance cost of the two GT10 turbines<br />

up to the first Major Inspection was US $140,000 for the two units<br />

(for the first three years). For a total of 50,000 operating hours at a<br />

combined output of 34,000 kW, this service cost comes to less than 0.2<br />

mils/kWhr. The estimated total cost of parts <strong>and</strong> service of the Major<br />

Inspection of Unit #2 was US $1,120,000; which is equivalent to 2.6<br />

mils/kWhr.<br />

Using the same payback calculation technique that was employed<br />

in the Corinth Motor Oil Project, the payback of the refinery<br />

cogen plant is estimated at 3.5 years. Figure 15-6 describes the plant<br />

operating characteristics.<br />

Figure 15-6. Hellenic Aspropyrgos Refinery Aspropyrgos, Greece.<br />

GT10 Combi/cogen Operating Parameters<br />

————————————————————————————————<br />

<strong>Gas</strong> <strong>Turbine</strong> Units<br />

2 × GT10, ABB STAL<br />

Unit Output 17 MW @ 95°F<br />

Fuels<br />

Steam <strong>Turbine</strong>-Generator<br />

HRSG<br />

High Pres. Steam<br />

Refinery Flare <strong>Gas</strong>/Propane/<br />

Diesel Oil<br />

15 MW, ABB Type WG1000<br />

30 tons/hr @ 609 psia/770°F<br />

Low Pres. Steam<br />

65 tons/hr @ 55 psia/338°F<br />

————————————————————————————————