ministry <strong>of</strong> <strong>textiles</strong><br />

Cabinet directed that MRS be examined<br />

by BRPSE. The revised scheme duly<br />

consulted with WRA & IFCI was furnished<br />

to MOT who in turn put up the scheme<br />

to BRPSE for their consideration. The<br />

BRPSE in its meeting held on 28.07.2010<br />

approved the MRS costing Rs. 313.90<br />

crore with the observation that figures<br />

may be updated 31.03.2011.<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Textiles</strong>, Government <strong>of</strong><br />

India had submitted Cabinet Note dated<br />

20.05.2011 for revival <strong>of</strong> The British India<br />

Corporation Ltd. with the cost <strong>of</strong> scheme<br />

amounting to Rs. 338.04 crores.<br />

The Cabinet vide its meeting held on<br />

09th June, 2011 approved the Revival<br />

Proposal. The Extract <strong>of</strong> the Minutes <strong>of</strong><br />

the Meeting is given below:-<br />

“The Cabinet considered the note dated<br />

20.05.2011 from the <strong>Ministry</strong> <strong>of</strong> <strong>Textiles</strong><br />

(Vastra Mantralaya) and accorded ‘in<br />

principle’ approval to the proposals<br />

contained in paragraph 7 there<strong>of</strong> subject<br />

to the condition that permission is first<br />

obtained for sale <strong>of</strong> the surplus land from<br />

the Government <strong>of</strong> Uttar Pradesh.”<br />

The implementation <strong>of</strong> the scheme will<br />

start as soon as NOC is obtained from<br />

Government <strong>of</strong> Uttar Pradesh for sale <strong>of</strong><br />

the surplus land and required formalities<br />

with BIFR are completed. Govt. <strong>of</strong> UP<br />

has now issued GO dated 28.09.2011<br />

permitting conversion <strong>of</strong> leasehold to<br />

freehold.<br />

BIC Ltd. has three subsidiaries viz. Elgin<br />

Mills Co. Ltd., Kanpur, Cawnpore <strong>Textiles</strong><br />

Ltd., Kanpur and Brushware Ltd., Kanpur.<br />

The Revival Plan for Elgin Mills Co. Ltd.<br />

has been approved. NITRA has prepared<br />

a revival scheme for Cawnpore <strong>Textiles</strong><br />

also which has been submitted to MOT<br />

for their approval.<br />

To clear up the balance sheets <strong>of</strong> Elgin<br />

Mills Co. Ltd. and Cawnpore <strong>Textiles</strong> Ltd.,<br />

OTS settlements with various bankers<br />

had been entered into settlements with<br />

Kotak Mahindra Bank, IDBI and PNB<br />

have been successfully concluded with<br />

IFCI remaining which is sub-judice before<br />

DRT/High Court, Allahabad. Similarly<br />

for Elgin Mills Co. Ltd., OTS settlement<br />

successfully concluded with IDBI, SCB,<br />

PNB, BOB, CCI. Conditions finalized<br />

with Canara Bank and IIBI. The issue <strong>of</strong><br />

Kotak Mahindra Bank and IFCI is subjudice.<br />

The OTS settlements have been arranged<br />

through loans from NTC.<br />

CAPITAL STRUCTURE<br />

The BIC Limited started with Authorized<br />

Share Capital <strong>of</strong> Rs. 55.00 crores. It<br />

stands as on date Rs. 304.62 crores<br />

after converting Government loan <strong>of</strong> Rs.<br />

249.62 crores into equity derated to 10%<br />

as per direction <strong>of</strong> BIFR.<br />

CAPACITY<br />

The capacity <strong>of</strong> the two Woollen Mills <strong>of</strong><br />

BIC after modernization as sanctioned by<br />

BIFR/BRPSE is 20680 Worsted Spindles,<br />

1920 Woollen Spindles, 79 Power Looms<br />

and 62 Handlooms.<br />

PERFORMANCE DURING 2009-10<br />

(AUDITED), 2010-11 (PROVISIONAL)<br />

2011-12 (UPTO JAN.,12) AND 2011-<br />

12 (PROJECTED).<br />

FINANCIAL RESULTS<br />

The net pr<strong>of</strong>it/cash loss for the year<br />

2009-10 (Audited), 2010-11 (Provisional),<br />

2011-12 (upto Jan.,12) and 2011-12<br />

(PROJECTED) <strong>of</strong> BIC Limited are given<br />

at table 12.4.<br />