07.05.2015 Views

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

Figure 14.9: Isometric View of the Void Blocks in the Block Model (View to NW)<br />

14.3.4.5 Drill Core Assay Composites and Statistics<br />

The drill core assay data set used in the updated resource estimate contains 28,807 core<br />

sample records exclusive of quality control and quality assurance samples, including 24,367<br />

core samples occurring within the peripheral resource domain solid. Sample lengths range<br />

between 0.3 m and 6.0 m for the peripheral domain core sample subpopulation, with over<br />

90% of samples measuring 1.0 m in length. Frequency histograms and cumulative frequency<br />

distribution plots for the sample lengths for these were presented by Cullen et al. (2012).<br />

Based on these results, down hole assay composites at 1.0 m support were developed for<br />

silver, lead and zinc for drill hole intervals intersecting the respective metal domain solid<br />

models. In addition, 627 trench samples completed in 2011 were included in the resource<br />

estimate. Trench samples were converted into horizontal drill holes and included in the down<br />

hole compositing process. No lithological constraints we imposed on down hole assay<br />

compositing.<br />

Descriptive statistics were calculated for each metal from 1.0 m assay composite datasets<br />

constrained within the respective metal domains and results are presented in Table 14.1.<br />

Distribution histograms, cumulative frequency plots and probability plots for the 1.0 m<br />

composites are included in the previously disclosed resource estimate technical report by<br />

Cullen et al. (2012).<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 123

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!