<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

The project will be designed and constructed to industry and regulatory standards, with<br />

emphasis on addressing environmental and safety issues. Adherence to the <strong>Project</strong><br />

Execution Plan will ensure timely and cost effective completion, while ensuring quality is<br />

maintained.<br />

The PEP is a comprehensive plan that includes the following:<br />

<br />

<br />

<br />

<br />

<br />

<br />

Engineering (Basic and Detailed)<br />

Procurement<br />

Construction<br />

Pre-commissioning and commissioning<br />

Start-up/ramp-up<br />

Handover to operator team (operational readiness)<br />

<br />

<strong>Project</strong> Closure<br />

The PEP will be executed by a combination of teams:<br />

<br />

<br />

<br />

<br />

<br />

Contractor’s team<br />

Detailed Engineering Team<br />

Procurement Team<br />

Construction Management Team<br />

Owner’s teams<br />

24.1.2 Scope of Work<br />

All work acquired for completion of the <strong>Pulacayo</strong> <strong>Project</strong> is covered in the Work Breakdown<br />

Structure (WBS) shown in the Table 24.1. The WBS contains a complete definition of the<br />

project’s scope and forms the basis for planning, execution and control.<br />

Table 24.1: Work Breakdown Structure (WBS – level 1 only)<br />

Area Description Area Description<br />

0 PROCESS PLANT (General) 3100 Entrance Attendance Office<br />

100 Crushing Area 3110 Visitors Parking<br />

200 Milling Circuit 1 Area 3120 Internal Plant Parking<br />

Milling Circuit 2 Area<br />

3130 Weighbridge<br />

300 Bulk And Lead Flotation Circuit 1 Area 3150 Central Offices<br />

Bulk And Lead Flotation Circuit 2 Area 3160 Laydown Area<br />

400 Zinc Flotation Circuit 1 Area 3180 Workshops<br />

Zinc Flotation Circuit 2 Area<br />

3190 Warehouse<br />

500 Separation Solid/Liquid 3200 Oil Storage<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 283

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!