<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

The <strong>Pulacayo</strong> concentrator plant is designed to operate based on three 8 hour shifts per<br />

day. The overall availability design for is 86.2%, this will allow sufficient downtime for<br />

planned and unplanned maintenance process plant equipment.<br />

The processing plant is designed to process 1,000 t/d and recover the base metals through<br />

the process described in Figure 17.1<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />