Pulacayo Project Feasibility Study - Apogee Silver
Pulacayo Project Feasibility Study - Apogee Silver
Pulacayo Project Feasibility Study - Apogee Silver
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />
090644-3-0000-20-IFI-100<br />
27 REFERENCES<br />
Surface Mining, Society for Mining, Metallurgy and Exploration, Edition 2, Pg. 397,<br />
Kennedy B.A., 1990.<br />
Some new Q-value correlations to assist in site characterization and tunnel design.<br />
International Journal of Rock Mechanics and Mining Sciences, Volume 39, Pg. 185-<br />
216, Barton, 2002.<br />
Preliminary Metallurgical Evaluation of Samples from <strong>Pulacayo</strong> Prospect, Bolivia,<br />
Deepak Malhotra (Resource Development Inc.), 17 March 2003.<br />
Experimentación Metalúrgica con Muestra Compleja de Sulfuros Denominada Alta<br />
Ley Proveniente del Sector <strong>Pulacayo</strong> y Perteneciente a la empresa <strong>Apogee</strong> Minerals<br />
Bolivia S.A., Universidad Técnica de Oruro (UTO), Facultad Nacional de Ingeniería,<br />
Carrera de Metalurgia y Ciencia de Materiales, Laboratorio Concentración de<br />
Minerales, November 2009.<br />
Reporte N°5-TWP-2011/Pruebas de Cianuración Proyecto <strong>Pulacayo</strong> - Bolivia<br />
(ED&ED), June 2011.<br />
Reporte N° 01-TEC-2011, Pruebas de Flotación Diferencial Pb/Zn Proyecto<br />
<strong>Pulacayo</strong>-Bolivia, 03 October 2011.<br />
Report of Investigation, Sedimentation Bench Scale Tests, Flotation Tailings,<br />
FLSMIDTH SAC, November 2011.<br />
Evaluation Geomecanica del Proyecto de Minado en la Mina <strong>Pulacayo</strong>-Bolivia, 2011.<br />
Mineral Resource Estimate Technical Report for the <strong>Pulacayo</strong> Ag-Pb-Zn Deposit<br />
<strong>Pulacayo</strong> Township, Potosí District, Quijarro Province, Bolivia, Peter Webster,<br />
P.Geo, Michael Cullen, P. Geo, Mercator Geological Services Limited, 23 May 2012<br />
Technical Report on the Preliminary Assessment of the <strong>Pulacayo</strong> <strong>Project</strong>, <strong>Pulacayo</strong><br />
Township, Potosí District, Quijarro Province, Bolivia, R. Pressacco,Msc(A), P.Geo, G<br />
Harris, CEng MIMM, M.Godard, PEng, C. Jacobs CEng MIMM, MICON (Mineral<br />
Industry Consultants) 25 June 2012.<br />
Experimentación Metalúrgica con Muestra Compleja de Sulfuro Perteneciente a la<br />
empresa <strong>Apogee</strong> Minerals Bolivia S.A., Universidad Técnica de Oruro (UTO),<br />
Facultad Nacional de Ingeniería, Carrera de Metalurgia y Ciencia de Materiales,<br />
Laboratorio Concentración de Minerales, August 2012.<br />
Surface Water <strong>Feasibility</strong> Assessment Final Report, Klohn Crippen Berger, October<br />
2012<br />
Revised Mineral Resource Estimate Technical Report for the <strong>Pulacayo</strong> Ag-Pb-Zn<br />
Deposit <strong>Pulacayo</strong> Township, Potosí District, Quijarro Province, Bolivia,Peter<br />
Webster, P.Geo, Michael Cullen, P. Geo (Mercator Geological Services Limited), 19<br />
October 2012.<br />
Report 12/082: Laboratory Flotation Optimization Testwork and Locked Cycle<br />
Flotation Tests on Ore Samples from <strong>Apogee</strong> <strong>Silver</strong>, Hennie Stallknecht (Maelgwyn<br />
Mineral Services, MMSA), 10 December 2012.<br />
Estudio de Evaluación de Impacto Ambiental Analítico Específico (EEIA-AE)<br />
Proyecto de Explotación de Minerales Complejos y Construcción Presa de Colas-<br />
<strong>Pulacayo</strong>, ASC Bolivia LDC, January 2013.<br />
TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />
Page 296