<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

18.4 Site Buildings<br />

The process facility and ancillary buildings include the following:<br />

18.4.1 Process Plant<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Receiving Crushing and Screening<br />

Milling<br />

Lead Flotation<br />

Zinc Flotation<br />

Separation Solid/Liquid<br />

Filtration of Concentrates<br />

Reagents<br />

Process Water<br />

Auxiliary Services<br />

Tailings Storage Facility Area<br />

Backfill Plant<br />

18.4.2 General Site Development<br />

<br />

<br />

<br />

<br />

<br />

<br />

Main Access Road<br />

Main Tension (MT) Electrical Supply<br />

Main Low Tension (LT) Sub station<br />

Waste Dump Area<br />

Railway<br />

Camp<br />

18.4.3 Process Plant Site Development<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Internal Plant Roads<br />

Plant Spillage Containment Dam<br />

Electrical Generators<br />

Septic Tanks<br />

Process Plant Access Gate<br />

Entrance First Aid Facilities<br />

Visitors Parking<br />

Internal Plant Parking<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 186

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!