07.05.2015 Views

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

<strong>Apogee</strong> QAQC programs is of quality acceptable for resource estimation use. The Micon<br />

report should be consulted if access to more detailed information pertaining to drilling<br />

programs carried out by <strong>Apogee</strong> prior to January 2010 is required. QAQC discussions<br />

presented below in this report pertain only to drilling carried out by <strong>Apogee</strong> since January<br />

2010.<br />

12.3.2 Certified Reference Material Programs<br />

January 2010 to July 2011<br />

The following description of certified reference material program results is taken from Cullen<br />

et al (2012) with only minor local modification of text to match the current reporting context.<br />

<strong>Apogee</strong> has used three certified reference standards since the Phase IV drilling program<br />

commenced in January of 2010. These are CDN-SE-1, obtained from CDN Resource<br />

Laboratories (CDN) of Burnaby, BC and PB128 and PB138, obtained from WCM Minerals<br />

Ltd. (WCM) of Burnaby, BC. CDN-SE-1 has been used since the start of the Phase IV drill<br />

program, beginning with drill hole PUD141, and remained in use at the effective date of this<br />

report. PB128 was used in pre January 2010 programs, beginning with drill hole PUD061,<br />

and was replaced by PB138 at drill hole PUD207. Descriptions for all certified reference<br />

materials appear in the previously disclosed resource estimate technical report by Cullen et<br />

al. (2012) and Table 12.1 presents their certified mean values.<br />

In total, results for 178 certified reference samples submitted for analysis were reviewed for<br />

this project period. This includes all certified reference samples used during the <strong>Apogee</strong><br />

Phase IV drilling program during the period plus those pertaining to Phase III drill holes<br />

PUD134 through PUD138 for which assay results had not be received at the time of the<br />

Micon PEA in 2010. Reference samples were systematically inserted into the laboratory<br />

sample shipment sequence by <strong>Apogee</strong> staff that ensured that at least one standard was<br />

submitted for every 50 samples. Records of reference standard insertion were maintained as<br />

part of the core sampling and logging protocols.<br />

Table 12.1: Certified Reference Materials Data for January 2010 to October 2011 Period<br />

Certified Mean Value ±2 Standard Deviations<br />

Reference Material Ag g/t Pb % Zn % Number<br />

CDN-SE-1 712 ±57 1.92 ±0.09 2.65 ±0.20 82<br />

PB128 181 ±16.41 4.43 ±0.342 2.25 ±0.18 91<br />

PB138 199 ±8.958 2.04 ±0.149 2.08 ±0.124 5<br />

The CDN-SE-1 standard was used exclusively during the Phase IV drill program initiated in<br />

January 2010 and is still in use by <strong>Apogee</strong>. In total, 82 samples of the material were analyzed<br />

during the drilling period covered in this report section, with samples submitted in association<br />

with drill holes PUD141 through PUD214. Returned Ag values fall within a +15 g/t and -55 g/t<br />

range of the 95% confidence interval certified mean range and the average value of 698.75<br />

g/t falls within the mean ±2 standard deviations control limits. One sample value falls below<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!