<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

18.9.3 TSF Design Criteria<br />

Table 18.2 summarizes the design criteria for the TSF along with the source of each value. This<br />

criteria was developed from industry standards, requirements to meet the plant criteria (such as<br />

operating life and capacity), calculations and modeling of the paste plant, data developed by the<br />

owner’s team, and the design engineers’ recommendations and experience.<br />

Table 18.2: TSF Design Criteria<br />

Item Description Units Value Source<br />

Tailings production<br />

Total t 3,519,000 A<br />

Total to TSF t 1,346,000 A<br />

m 3 1,121,700 D<br />

Nominal Minimum average daily discharge to TSF (Yr 4) t/d 83 A<br />

Maximum average daily discharge to TSF (Yr 12) t/d 986 A<br />

Density (terminal bulk specific gravity, dry wt basis) t/m 3 1.2 D<br />

Water content (total wt basis)<br />

As discharged % 30 - 37 D<br />

Long-term (as retained, average) % 33 C, D<br />

<strong>Project</strong> life years 12.5 A<br />

Design Rainfall<br />

Average annual rainfall mm Average of record B<br />

Maximum annual rainfall mm Maximum on record B<br />

Peak storm event, diversion works mm 50 - year, 24 - hour B<br />

Peak storm event, impoundments & ponds mm 100 - year, 24 - hour B<br />

Impoundment design (closure) mm 50% of PMP B<br />

Slope stability<br />

Minimum FoS, static (short term) - 1.3 B, C<br />

Minimum FoS, static (long term) - 1.5 B, C<br />

Minimum FoS, pseudo-static - 1 B, C<br />

Design seismic event<br />

Return interval (operating life) years 475 B, C<br />

Design seismic acceleration g 0.20 D<br />

Maximum allowable seismic-induced displacement m 1 B, C<br />

Containment systems<br />

Tailings impoundment -<br />

Geologic & cement -<br />

treated tailings<br />

Emergency pond - Geomembrane B,C<br />

B,D,C<br />

Capping system for TSF - Cement - treated B,C<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 193