<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

A second outlet from the mine has been included in the design and will be available for<br />

people in case of emergencies. This outlet will be located in the vent raise adjacent to the<br />

west ramp. The vent raise measures 3 m (h) x 3 m (w). It will have fresh air intake from<br />

surface and it will be equipped with a ladder system. The raise intersects the west ramp at<br />

each level and hence will be accessible from all levels, as shown in Figure 16.5 below.<br />

Figure 16.5: A Secondary Mine Outlet (Vent Raise)<br />

16.3 Mine Production<br />

The mine has been designed for an ore production of 1,000 tons (t) per day. The mine plan<br />

indicates a total of 3,557 Million tons of ore and 0.839 Million tons of waste. These will be<br />

extracted over a planned 12.5 Life of Mine (LOM). The average grades over the LOM are<br />

239 g/t for silver, 1.09% for lead and 1.91% for zinc. A summary of the annual mine<br />

production plan is outlined in the table below.<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 151

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!