<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

July 2011 to January 2012 Programs<br />

The oxide zone diamond drilling program was carried out between September 2011 and<br />

December 2011 and some oxide zone resampling of earlier holes was carried out in January<br />

of 2012. Certified reference material insertion protocols for this period were the same as<br />

those described above for the earlier <strong>Apogee</strong> program. The CDN SE-1 and PB138 reference<br />

materials were used during this period and results for both typically fall within the mean ±2<br />

standard deviations control limits for the project. Slight low bias within the control limits is<br />

notable for Pb in CDN-SE-1 and Pb -138 results show similar slight low bias within control<br />

limits for all three metals. Results for the two reference materials are interpreted as indicating<br />

an acceptable degree of accuracy in the associated data set. Figures 12.14 to Figure 12.19<br />

present certified reference material Ag, Pb and Zn results for this program.<br />

Figure 12.11: Certified Standard Pb138 Results - Ag G/T (N=5)<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!