<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

Figure 16.1: Layout of a Shrinkage Stope at <strong>Pulacayo</strong> Mine<br />

Ore will be mined in horizontal slices from the bottom to the top of a stoping block. Stopers<br />

will be used to drill 41 millimeters (mm) diameter blast holes into the hangingwall of the<br />

stope, and Anfex will be used to charge the blast holes. During mining, only 30% of the<br />

blasted ore (swell) will be drawn out after each blast to create enough headroom for the<br />

drilling of the next slice of ore.<br />

The remaining broken ore will be stored in the stope to support to the sidewalls and to serve<br />

as a working platform. Once the entire stoping block has been mined out, the remaining ore<br />

will be drawn out. The broken ore will be drawn out via boxholes. The boxholes will be<br />

located along the ore drive and they will be equipped with pneumatically controlled chutes to<br />

allow for safe and easy loading. The ore will be loaded into hoppers and it will be trammed<br />

out of the mine and tipped at the ore stockpile at the process plant. The mine will use one<br />

4 tonne locomotive pulling five 3 tonne hoppers to accomplish this. At the end of a stope’s<br />

life, it will be sealed off accordingly. No backfill will be placed in the stopes.<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 146

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!