07.05.2015 Views

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

Table 21.3: <strong>Project</strong> Operating Costs<br />

Operating Year - y-1 y-2 y-3 y-4 y-5 y-6 y-7 y-8 y-9 y-10 y-11 y-12 y-13<br />

Calendar Year LoM Total 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025<br />

Tonnes Mined to Stockpile, t<br />

Production Ore, t 3,108,853 1,554 41,708 92,170 178,444 209,921 255,736 361,355 365,009 363,243 361,982 366,580 367,580 143,572<br />

Development Ore, t 448,830 9,762 56,178 78,702 80,717 74,058 149,414 - - - - - - -<br />

Total Ore Extracted,<br />

t<br />

3,557,683 11,316 97,886 170,872 259,160 283,979 405,150 361,355 365,009 363,243 361,982 366,580 367,580 143,572<br />

Total Waste, t 839,887 36,072 162,058 119,344 38,137 106,003 378,273 - - - - - - -<br />

Metal Production (Ex mine)<br />

Ag Grade, g/t 239 129 244 332 365 341 272 262 198 199 191 191 173 178<br />

Pb Grade, % 1.09 0.63 1.71 1.66 1.77 1.44 1.28 1.53 0.80 0.77 0.72 0.69 0.81 0.78<br />

Zn Grade, % 1.91 1.37 2.61 3.27 3.05 2.18 1.89 2.13 1.40 1.56 1.63 1.66 1.65 0.92<br />

Ag, Oz 27,385,190 47,075 767,242 1,826,019 3,044,585 3,116,811 3,547,892 3,049,533 2,326,971 2,319,851 2,222,524 2,251,479 2,042,721 822,486<br />

Pb, t 38,927 71 1,673 2,828 4,576 4,083 5,202 5,519 2,928 2,809 2,615 2,528 2,979 1,115<br />

Zn, t 67,905 155 2,552 5,581 7,916 6,182 7,663 7,702 5,124 5,650 5,912 6,093 6,057 1,319<br />

Total Tons Milled<br />

from Stockpiles, t<br />

<strong>Silver</strong> grade<br />

milled, g/t<br />

Pb Grade<br />

milled, %<br />

Zn Grade<br />

milled, %<br />

<strong>Silver</strong><br />

Metal<br />

Processed<br />

(not recovered), Oz<br />

3,516,000 - 83,000 180,000 249,000 304,000 360,000 360,000 360,000 360,000 360,000 360,000 360,000 180,000<br />

240 - 240 326 366 340 272 264 207 199 192 191 176 176<br />

1.10 - 1.64 1.67 1.77 1.45 1.28 1.50 0.90 0.78 0.73 0.69 0.79 0.79<br />

1.92 - 2.44 3.25 3.14 2.18 1.89 2.10 1.50 1.53 1.62 1.66 1.65 1.19<br />

27,173,397 - 639,945 1,887,227 2,933,347 3,323,087 3,153,548 3,052,631 2,392,163 2,298,889 2,223,948 2,211,034 2,037,556 1,020,021<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 268

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!