07.05.2015 Views

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

Figure 12.21: Blank Sample Values Pb % (N=174)<br />

Figure 12.22: Blank Sample Values Pb % (N=174)<br />

July 2011 to January 2012 Programs<br />

The oxide zone diamond drilling program was carried out between September 2011 and<br />

December 2011 and some oxide zone resampling of earlier holes was carried out in January<br />

of 2012. The blank sample insertion protocol for this period was the same as described<br />

above for the earlier <strong>Apogee</strong> program and Figure 12.23, Figure 12.24 and Figure 12.25<br />

present Ag, Pb and Zn results, respectively. These results are interpreted as indicating that<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 80

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!