<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

Figure 14.15: Isometric View of the Mineral Resource Categories – View to NW 133<br />

Figure 14.16: Isometric View of the Indicated Mineral Resource – View to NW 134<br />

Figure 14.17: Isometric View of the Inferred Mineral Resource – View to NW 134<br />

Figure 14.18: Isometric View of Whittle Pit Shell Developed by P&E – View to Nw 136<br />

Figure 14.19: Resource Sensitivity - Block Ag G/T Grade and Tonnage 138<br />

Figure 14.20: Resource Sensitivity - Oxide Zone Block Ag (G/T) Grade and Tonnage 138<br />

Figure 14.21: Isometric View of the Sulphide Zone Block NSR Value Distribution 139<br />

Figure 14.22: Isometric View of the Oxide Zone Block <strong>Silver</strong> Grade Distribution 140<br />

Figure 16.1: Layout of a Shrinkage Stope at <strong>Pulacayo</strong> Mine 146<br />

Figure 16.2: Top and Bottom Stope Accesses in Long Hole Stoping 147<br />

Figure 16.3: The Ramp System for Long Hole Stoping 149<br />

Figure 16.4: Layout of the Mine 150<br />

Figure 16.5: A Secondary Mine Outlet (Vent Raise) 151<br />

Figure 16.6: Development metres at <strong>Pulacayo</strong> mine 155<br />

Figure 16.7 Alternative reinforcement design at the bottom of a stope to be backfilled 157<br />

Figure 16.8: Below Shows a Schematic Cross-Section Through a Bulkhead 158<br />

Figure 16.9: Stoping Tonnage versus Annual Ventilation Requirements with Time 159<br />

Figure 16.10: <strong>Pulacayo</strong> Complete Footprint - View Looking Southwest 161<br />

Figure 16.11: Location of the Underground Workshop 167<br />

Figure 17.1 Overall Process Flow Diagram 171<br />

Figure 17.2 Overall Site Layout 178<br />

Figure 17.3 Concentrator Area Layout 179<br />

Figure 18.1: 115 kV Power Line Trazo Tazna-<strong>Pulacayo</strong> 183<br />

Figure 18.2 Power Distribution 185<br />

Figure 18.3 General Arrangement of TSF Dikes, Emergency Pond and Monitoring Ports 192<br />

Figure 18.4 Cross-Section of Dikes 1 & 2 with Raises 195<br />

Figure 18.5 Ultimate TSF Plan Vie 199<br />

Figure 19.1: Global Refined Zinc Consumption 206<br />

Figure 19.2: Global Refined Lead Consumption 207<br />

Figure 19.3: Forecast ZN Consumption: 2008 to 2020 208<br />

Figure 19.4: Zinc Metal Demand Vs Supply: 1990 to 2020 209<br />

Figure 19.5: Zinc Outlook: Impending Stock Squeeze? 209<br />

Figure 19.6: Forecast Lead Supply Vs Demand to 2016 210<br />

Figure 19.7: Zinc Prices: 1989 to Present 211<br />

Figure 19.8: LME Zinc Inventories: 2007 to Present 211<br />

Figure 19.9: Lead Prices: 1989 to Present 212<br />

Figure 19.10: Zinc Forward Curve 215<br />

Figure 19.11: Lead Forward Curve 218<br />

Figure 19.12: <strong>Silver</strong> Prices: 2009 to Present 219<br />

Figure 19.13: Baltic Dry Index: 2000 – 2012 235<br />

Figure 21.1 Breakdown of LOM Operating Costs 267<br />

Figure 22.1: <strong>Silver</strong> Price Sensitivity 282<br />

Figure 24.1: Simplified <strong>Project</strong> Schedule 286<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page viii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!