<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

16.7 Backfill<br />

Backfilling of mined out long hole stopes is planned to facilitate safe mining. Cemented<br />

backfill will provide permanent support to the stope excavation, particularly with regard to the<br />

mining of adjacent areas. Mitchell’s equation was used for the determination of the required<br />

strengths of a cemented backfill block with freestanding heights of 20 m and 30 m. The<br />

results indicate a UCS strength in the range of 0.35 MPa to 0.40 MPa.<br />

16.7.1 Test Work<br />

The backfill system presented in this study is conceptual. Appropriate detailed site specific<br />

project engineering work for detailed system design is recommended on process flow<br />

diagrams, process and instrument diagrams, mass balances, detailed equipment selection,<br />

detailed site specific equipment locations, and plant and equipment general arrangement<br />

drawings etc. Furthermore, only limited test work has been done on the hydraulic<br />

transportation properties of <strong>Pulacayo</strong> tails as part of the <strong>Feasibility</strong> <strong>Study</strong>. As a result, the<br />

pump, pipeline and equipment suggestions made in the <strong>Feasibility</strong> <strong>Study</strong> are based purely on<br />

industrial experience.<br />

16.7.2 Stope Backfilling Process<br />

Backfill bottom reinforcement: The sequence of mining, as proposed for <strong>Pulacayo</strong> mine,<br />

requires backfilled stopes to be undermined. As a result, the backfill in the lower portion of<br />

each stope will be reinforced to prevent the possible collapse of backfill into the lower stope.<br />

Mesh reinforcement, as practiced at Lucky Friday Mine in the United States, has therefore<br />

been suggested. F2416.7 shows the suggested reinforcement design.<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 156

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!