<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

<br />

<br />

<br />

<br />

Implementation of the Plan of Assimilable Domestic Solid Waste Management,<br />

considering the implementation and operation of a manual sanitary landfill, implement<br />

recycling programs and reducing the generation of solid waste.<br />

Implementation of an accumulation Plan of smaller volume waste, considering the use of<br />

deposits or fills of sterile material with all appropriate environmental control measures and<br />

promoting re-vegetation in the waste deposit, once the deposit is closed.<br />

Application of closure and rehabilitation plan that considers encapsulation of sterile<br />

material and tails with topsoil after completion of the project life.<br />

Canalization and DAM directness to water reservoir.<br />

20.4.1.3 Water<br />

The water factor identified 40 negative impacts, of which only one is marked as Critical being the<br />

remainder as mostly Moderate.<br />

The impacts rated as important are:<br />

<br />

<br />

<br />

<br />

Generation of acid mine water.<br />

Alteration of surface water regime.<br />

Generation of acidic water from rock dumps.<br />

Infiltration of rainwater through the waste rock dumps to the underground<br />

<br />

Risk alteration of the quality of ground water by filtering pollutants in the tailings dam area<br />

(PDC).<br />

Preventive measures are aimed at:<br />

<br />

<br />

<br />

<br />

Perform acidic water canalization to the water reservoir: In case of producing mine acid<br />

water by drilling by layers or water mass or when it reaches 100 meters of depth, which is<br />

considered the water table, this Water must be channeled to the water reservoir where it<br />

can be re-circulated for the concentration process in the plant.<br />

A recirculating water system will be implemented for the plant, this would promote the<br />

reuse of the process water and the water captured by the reservoir.<br />

The material from cuts and/or sterile materials should be stored in dried deposits arranged<br />

at an appropriate distance of 300 meters surrounding watercourses.<br />

The tailings disposal area must be an area with low permeability characteristics. Before<br />

tailings facility starts receiving paste, a compaction should be performed and if necessary<br />

waterproofing the sector with clay, obtaining the material from nearby sources. This<br />

measure will be analyzed during the design of the tailings dam facility.<br />

20.4.1.4 Fauna<br />

The major impacts identified for this factor are:<br />

<br />

<br />

Disturbance to terrestrial and aquatic fauna.<br />

Destruction and/or modification of habitat.<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 247

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!