Pulacayo Project Feasibility Study - Apogee Silver
Pulacayo Project Feasibility Study - Apogee Silver
Pulacayo Project Feasibility Study - Apogee Silver
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />
090644-3-0000-20-IFI-100<br />
Table 20.3: Currently Valid Permissions<br />
Title Author Year Details<br />
Exploration Stage<br />
Updated EMAP MEDMIN 2011 The environmental permit for the<br />
<strong>Pulacayo</strong> Exploration project has the<br />
license No. 05120102 C3 CD EMAP<br />
42/2011<br />
License for Activities with<br />
Hazardous Substances<br />
Sixth Report of<br />
Environmental Monitoring<br />
(IMA II/2012)<br />
MEDMIN 2011 The License for Activities with<br />
Hazardous Substances (LASP) for<br />
<strong>Pulacayo</strong> Exploration <strong>Project</strong> has the<br />
license Nº051201_LASP_019/2011.<br />
MEDMIN 2013 In January 2013, delivery was made of<br />
the Sixth Report of Environmental<br />
Monitoring (IMA) for the second half of<br />
2012 <strong>Pulacayo</strong> Exploration <strong>Project</strong> to<br />
the Autonomous Government of the<br />
Potosí Department.<br />
Exploitation Stage<br />
Environmental Record Draft<br />
of Extraction and<br />
Concentration of Complex<br />
Minerals and <strong>Pulacayo</strong><br />
tailings dam construction<br />
<strong>Study</strong> of Environmental<br />
Impact Assessment -<br />
Specific Analytical (IAES -<br />
AE)<br />
MEDMIN 2011 In August of 2011 it was obtained the<br />
categorization of the <strong>Project</strong><br />
Environmental Tab by MMAyA Report -<br />
VMA - DGMACC - FA No. 4011 (b)/11.<br />
Indicating that the <strong>Study</strong> of<br />
Environmental Impact Assessment<br />
(IAES) corresponds to a Specific<br />
Analytical <strong>Study</strong> (AE).<br />
MEDMIN 2013 In January 2013 delivery was made to<br />
the Ministry of Mining, Metallurgy, and<br />
Environmental Authority Sector the<br />
<strong>Study</strong> of Environmental Impact<br />
Assessment - Specific Analytical (IAES<br />
- AE) <strong>Project</strong> Mineral Extraction and<br />
Concentration Complex and <strong>Pulacayo</strong><br />
Tailings Dam Construction for review.<br />
Source: MEDMIN, 2013.<br />
Source: MEDMIN, 2013.<br />
20.6 Environmental Achievements<br />
The environmental achievements for <strong>Pulacayo</strong> Mining <strong>Project</strong> include:<br />
<br />
<br />
Updating the EMAP Form in 2011, this document contains information concerning the<br />
mineralogical material extraction from <strong>Pulacayo</strong> hill, in order to make external<br />
metallurgical testing with a maximum of 2000 tons per month.<br />
License for Activities with Hazardous Substances (LASP) in 2011 A license authorizing<br />
the transport, storage, preparation, use and disposal of hazardous substances involved in<br />
the stage of Mining Exploration.<br />
TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />
Page 252