07.05.2015 Views

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

Table 20.3: Currently Valid Permissions<br />

Title Author Year Details<br />

Exploration Stage<br />

Updated EMAP MEDMIN 2011 The environmental permit for the<br />

<strong>Pulacayo</strong> Exploration project has the<br />

license No. 05120102 C3 CD EMAP<br />

42/2011<br />

License for Activities with<br />

Hazardous Substances<br />

Sixth Report of<br />

Environmental Monitoring<br />

(IMA II/2012)<br />

MEDMIN 2011 The License for Activities with<br />

Hazardous Substances (LASP) for<br />

<strong>Pulacayo</strong> Exploration <strong>Project</strong> has the<br />

license Nº051201_LASP_019/2011.<br />

MEDMIN 2013 In January 2013, delivery was made of<br />

the Sixth Report of Environmental<br />

Monitoring (IMA) for the second half of<br />

2012 <strong>Pulacayo</strong> Exploration <strong>Project</strong> to<br />

the Autonomous Government of the<br />

Potosí Department.<br />

Exploitation Stage<br />

Environmental Record Draft<br />

of Extraction and<br />

Concentration of Complex<br />

Minerals and <strong>Pulacayo</strong><br />

tailings dam construction<br />

<strong>Study</strong> of Environmental<br />

Impact Assessment -<br />

Specific Analytical (IAES -<br />

AE)<br />

MEDMIN 2011 In August of 2011 it was obtained the<br />

categorization of the <strong>Project</strong><br />

Environmental Tab by MMAyA Report -<br />

VMA - DGMACC - FA No. 4011 (b)/11.<br />

Indicating that the <strong>Study</strong> of<br />

Environmental Impact Assessment<br />

(IAES) corresponds to a Specific<br />

Analytical <strong>Study</strong> (AE).<br />

MEDMIN 2013 In January 2013 delivery was made to<br />

the Ministry of Mining, Metallurgy, and<br />

Environmental Authority Sector the<br />

<strong>Study</strong> of Environmental Impact<br />

Assessment - Specific Analytical (IAES<br />

- AE) <strong>Project</strong> Mineral Extraction and<br />

Concentration Complex and <strong>Pulacayo</strong><br />

Tailings Dam Construction for review.<br />

Source: MEDMIN, 2013.<br />

Source: MEDMIN, 2013.<br />

20.6 Environmental Achievements<br />

The environmental achievements for <strong>Pulacayo</strong> Mining <strong>Project</strong> include:<br />

<br />

<br />

Updating the EMAP Form in 2011, this document contains information concerning the<br />

mineralogical material extraction from <strong>Pulacayo</strong> hill, in order to make external<br />

metallurgical testing with a maximum of 2000 tons per month.<br />

License for Activities with Hazardous Substances (LASP) in 2011 A license authorizing<br />

the transport, storage, preparation, use and disposal of hazardous substances involved in<br />

the stage of Mining Exploration.<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 252

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!