<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

Area Description Area Description<br />

900 Concentrate Filtration Area 3210 Gas Storage<br />

1000 Reagents Area 3220 Paint Store<br />

1200 Process Water Area 3230 Nuclear Source Store<br />

1300 Auxiliary Services 3240 Diesel Storage<br />

1400 Tailings Disposal Area 3250 Potable Water Tank<br />

1500 Backfill 3260 Fresh Water Tanks (Storage)<br />

2000 GENERAL SITE DEVELOPMENT 3270 Main Site Fence<br />

2010 Main Access Road 3300 Laboratory<br />

2020<br />

High Tension (HT) Electrical Supply<br />

(External)<br />

3310 Laundry<br />

2030 Main Low Tension (LT) Substation 3320 Changehouse<br />

2040<br />

Medium Tension (MT) Electrical Supply<br />

(external)<br />

4000 MINE COSTS<br />

2050 Main Water Supply (Yanapollera Reservoir) 4100 Capital Development<br />

2060 Waste Dump Area 4300 Capital Equipment<br />

2070 Railways 4400 Auxiliary Services<br />

2080 Camp 5000 WORKING CAPITAL<br />

3000 PROCESS PLANT SITE DEVELOPMENT 5100 HT Power Line Package<br />

3010 Internal Plant Roads 6000 INDIRECT COSTS<br />

3030 Plant Spillage Containment Dam 6100<br />

Engineering, Procurement &<br />

Construction Management (EPCM)<br />

3040 Electrical Generators 6300 Freight, Taxes, and Insurance<br />

3050 Septic Tank 6400<br />

Purchasing Management and Capital<br />

Spares<br />

3060 Process Plant Access Gate 6500 Start-up and Commissioning<br />

3070 Entrance Security Facilities 6800 Owner´s Costs<br />

3080 Entrance First Aid Facilities 7000 CLOSURE COSTS<br />

3090 Entrance Induction Office 8000 CONTINGENCY<br />

24.1.3 <strong>Project</strong> Schedule<br />

24.1.3.1 Critical Success Factors<br />

<br />

<br />

<br />

Early freezing of the design, and commitment to procure long lead items.<br />

Rapid and clear communication lines between stakeholders.<br />

Clearly defined roles and responsibilities for project team members (owner and<br />

contractor).<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 284