<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

<br />

<br />

The Run-of-Mine (ROM) will be trucked out of the mine and tipped at the stockpile at<br />

the process plant. The average grades of the RoM product delivered to the plant<br />

have been estimated to be 240 g/t for silver, 1.10% for lead and 1.92% for zinc over<br />

the life of mine.<br />

From the stockpile, the ROM material will pass through a beneficiation plant<br />

comprising a crushing circuit, a milling and cycloning circuit, two sequential floatation<br />

stages (the first for lead and the second for zinc) and a filtration plant, producing a<br />

lead concentrate and a zinc concentrate. The contents and grade of each<br />

concentrate are tabulated below:<br />

Table 22.2: Products of the Process Plant<br />

Lead Concentrate Zinc Concentrate<br />

Pb (%) 48 1.12<br />

Zn (%) 6.53 51<br />

Ag (g/t) 7.438 411<br />

Fe (%) - 2.19<br />

Si (%) - 1.93<br />

As (%) 1.48 0.03<br />

Sb (%) 1.25 0.04<br />

Bi (%) 0.03 -<br />

<br />

The two concentrates will then pass through the sales process. The quantities of<br />

concentrate and the cost per equivalent silver ounce over the mine life are shown in<br />

the table below:<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 277