<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Weighbridge<br />

Central Offices<br />

Laydown Area<br />

Workshop<br />

Warehouse<br />

Oil Storage<br />

Gas Storage<br />

Paint Storage<br />

Nuclear Source Store<br />

Diesel Storage<br />

Potable Water Plant<br />

Main Site Fence<br />

Laboratory<br />

Laundry<br />

Change house<br />

18.4.4 Mine Infrastructure and Ancillary Buildings<br />

<br />

<br />

<br />

<br />

<br />

Magazine<br />

Warehouse<br />

Yard Storage<br />

Truck Wash<br />

Truck Fuel Storage and Fueling Station<br />

<br />

Tire Change Station<br />

At the end of the operating life of the processing plant, with the exception of those components to<br />

be utilized in the post-closure water treatment system, the plant would be decommissioned and<br />

demolished. A small amount of infrastructure would be left in place for post-closure use, including<br />

conversion of portions of the plant for water treatment. The main power line and ancillary<br />

equipment utilized during operations would be removed and the cable salvaged. Once the off-site<br />

man camp is no longer required, the camp would be converted to an alternative beneficial use by<br />

a future custodian or local community representative.<br />

18.5 Water Storage and Distribution<br />

Klohn Crippen Berger (KCB) was requested to develop the Surface Water <strong>Feasibility</strong> Assessment<br />

for <strong>Pulacayo</strong> <strong>Project</strong>. KCB visited the site in May 2012. Fundacion Medmin, a Bolivian consulting<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 187

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!