07.05.2015 Views

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

16.9.5 Swell Factor<br />

The swell factor is the ratio of the bank density of material to the loose density of the same<br />

material. It is used to calculate the weight and volume of material that has been blasted and<br />

is to be loaded and hauled to its destination. The average in-situ density of ore and waste is<br />

2.47 t/m 3 and 2.2 t/m 3 respectively. The swell factor for both ore and waste is estimated to<br />

be 30% and the loose densities were estimated to be 1.90 t/m 3 for ore and 1.69 t/m 3 for<br />

waste.<br />

16.10 Mine Equipment Fleet Requirements<br />

A trade-off study has been done to estimate the fleet of equipment required to meet the<br />

mine’s production targets. To avoid double accounting, the study took into account the<br />

equipment that the mine already owns. The mine is currently extracting the upper portions of<br />

the deposit using shrinkage stoping and the primary equipment used to accomplish this is<br />

listed below:<br />

<br />

<br />

<br />

<br />

<br />

<br />

4 locomotives<br />

4 flat cars<br />

10 x 1 tonne Granby cars<br />

5 x 4 tonne hoppers<br />

2 air loaders (each with a 0.5 tonne bucket)<br />

12 stopers<br />

<br />

12 jackleg hand-drills<br />

In addition to the equipment listed above, the mine also owns a fleet of refurbished trackless<br />

equipment, which is not currently in use (see Table 16.5 below).<br />

Table 16.5: Trackless Equipment Owned by <strong>Pulacayo</strong> Mine<br />

Equipment Model Quantity<br />

LHD<br />

Atlas Copco ST3.5 with a bucket capacity of 3.1 m 3 and a<br />

tramming capacity of 6.0 tonne<br />

2<br />

Truck<br />

Atlas Copco MT416 Wagner with a dump box volume of<br />

7.5 m 3 and a rated payload of 15 tonne<br />

Development drill rig Sandvik secoma quasar 14B 1<br />

1<br />

16.10.1 Primary Equipment<br />

Table 16.6 summarizes the number of primary equipment required to supplement the<br />

equipment that the mine already has. These were determined based on the mine calendar<br />

and the production schedule:<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 163

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!