07.05.2015 Views

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

14.3.4.13 Model Validation<br />

Results of block modeling were reviewed in three dimensions and compared on a section by<br />

section basis with corresponding manually interpreted sections prepared prior to model<br />

development. This showed block model grade patterns within the sulphide zone to generally<br />

conform to a near-vertical east-west striking deposit system with a moderate westerly grade<br />

plunge (Figure 14.21). This is consistent with the recognized east-west normal fault<br />

controlled systems of the <strong>Pulacayo</strong> dome complex, locally represented as stock work, narrow<br />

vein and associated disseminations in the overlying volcanic rocks and high grade vein style<br />

mineralization of intruded sedimentary rocks.<br />

Figure 14.21: Isometric View of the Sulphide Zone Block NSR Value Distribution<br />

Oxide zone silver grade distribution showed discrete zones of mineralization that have good<br />

correlation with higher grade mineralization within the underlying sulphide zone (Figure<br />

14.22). Overall, results of the visual inspection of both the sulphide and oxide zones for all<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 139

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!