<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

Figure 16.7 Alternative reinforcement design at the bottom of a stope to be backfilled<br />

The reinforcement will be installed remotely to ensure the safety of people. It is proposed that<br />

two operators position themselves on either side of the top of the stope (wearing PPE), or on<br />

a suitable portable steel gantry placed across the top of the stope. The reinforcement will be<br />

attached to ropes and lowered to the bottom of the stope. This operation may be facilitated<br />

by two additional operators, one at the top and one at the bottom of the stope in the entrance,<br />

using portable radios to direct the operators in lowering the strips.<br />

Bulkhead construction: Once the reinforcement has been installed, the stope will be sealed<br />

off with a bulkhead (see Figure 16.8 below). The outside of the bulkhead will be supported by<br />

a temporary hardwood timber structure. The timber support structure can be dismantled and<br />

removed after the backfill has cured for 28 days; thereafter, it can be re-used at another<br />

bulkhead.<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 157

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!