<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

17 RECOVERY METHODS<br />

The <strong>Pulacayo</strong> mineral processing plant design is based on metallurgical test results<br />

undertaken by various laboratories on behalf of <strong>Apogee</strong> <strong>Silver</strong> Ltd. Where the test work<br />

results were unavailable, assumed data from similar projects were used. The plant has been<br />

designed to process 1,000 t/d of polymetallic bearing mineral ores. The overall process plant<br />

and unit operations therein are designed to produce base metal concentrates of lead and<br />

zinc with silver reporting predominantly to the lead concentrate.<br />

The processing plant will include circuits for conventional crushing, screening, clays washing<br />

and screening, grinding, lead flotation, zinc flotation, concentrate filtration and storage,<br />

reagents storage and handling, tailings storage and disposal facility, backfill, auxiliary<br />

services, carbon columns to remove copper ions in solution and organic flotation reagents<br />

from the recirculated process water.<br />

The processing plant is a conventional design and comprises equipment of the type and size<br />

that has been proven in the plants processing similar mineral ores in the industry.<br />

17.1 Process Design Criteria<br />

<strong>Apogee</strong> <strong>Silver</strong> Ltd. tasked TWP Sudamérica S.A. to design a process plant for the <strong>Pulacayo</strong><br />

project with a design capacity of 1,000 t/d. For the design, TWP used an availability factor of<br />

86.2% for the crushing and milling areas. These design availabilities are fairly common for<br />

current and recent projects at TWP.<br />

The annual ore tonnage of 360,000 metric tons can be processed through the mill in<br />

360 days.<br />

A summary of the design parameters are given below in Table 17.1<br />

Table 17.1: Process Design Basis<br />

Parameter Unit Value<br />

Ore Characteristics<br />

<strong>Silver</strong>, Ag Design g/t 240<br />

Range g/t 135.6 ­ 487.3<br />

Mean g/t 302.3<br />

Lead, Pb Design % 1.1<br />

Range % 0.66 ­ 4.3<br />

Mean % 2.28<br />

Zinc, Zn Design % 1.92<br />

Range % 1.34 ­ 5.96<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 168