<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

Operating Year - y-1 y-2 y-3 y-4 y-5 y-6 y-7 y-8 y-9 y-10 y-11 y-12 y-13<br />

Calendar Year LoM Total 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025<br />

Inventory & Commissioning, USD 155,947 - - 155,947 - - - - - - - - - -<br />

Owner Costs, USD 3,332,000 - - 608,350 286,700 286,700 286,700 286,700 286,700 286,700 286,700 286,700 286,700 143,350<br />

Sub Total Sustaining CAPEX, USD 40,209,855 - - 6,326,655 5,358,565 4,537,378 6,000,043 3,920,211 3,117,387 2,602,455 2,169,272 2,547,341 2,554,924 1,075,623<br />

Contingency, USD 929,100 - - 929,100 - - - - - - - - - -<br />

Total Sustaining CAPEX, USD 41,138,956 - - 7,255,756 5,358,565 4,537,378 6,000,043 3,920,211 3,117,387 2,602,455 2,169,272 2,547,341 2,554,924 1,075,623<br />

Total Sustaining CAPEX, USD/ore<br />

t processed<br />

11.7 - -<br />

(*) LOM CAPEX contingency is 10% of the LOM Initial CAPEX<br />

35.15 21.52 14.93 16.67 10.89 8.66 7.23 6.03 7.08 7.10 5.98<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 257

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!