<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

Table 16.6: Additional Primary Trackless Equipment<br />

Equipment Typical model Quantity<br />

Truck<br />

Atlas Copco MT2010 with a dump box volume of 8.4 m3 and a<br />

rated payload of 20 tonne<br />

1<br />

Production drill rig Resemin raptor 55 drill rig (51 to 89 mm diameter) 1<br />

Roof bolter Resemin bolter 77D 1<br />

Shotcreter<br />

Atlas Copco Uni-grout miniflex E with a 200L capacity for the<br />

cemag agitator and 100L for the cemax mixer<br />

1<br />

16.10.2 Ancillary Equipment<br />

The ancillary equipment required to support the primary fleet of the mine was also<br />

determined. These are tabulated below.<br />

Table 16.7: Additional Primary Trackless Equipment<br />

Equipment type Typical model Quantity<br />

Cassette carrier Fermel liberator RoRo cassette handler 2<br />

Cassette (attachment) Fermel flatbed 1<br />

Fermel scissors lift 1<br />

Fermel fuel and oil lube cassette with 2 x 500L oil tanks,<br />

1 x 250L oil tank and 1 x 500L diesel tank<br />

Fermel general purpose cassette 1<br />

1<br />

16.11 Manpower Requirements<br />

Table 16.8 below summarizes the manpower requirements of <strong>Pulacayo</strong> mine per annum.<br />

Underground workers will be operating on an 8 days on, 4 days off, roster and they will be<br />

alternating between morning and night shifts. All the other departments (engineering,<br />

technical services and stores) will be operating during the day shift only. A 12% provision<br />

(for leave) has been made on underground workers that are fundamental to mine production<br />

and development.<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 164

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!