07.05.2015 Views

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

Figure 12.4: Core Facility Staff Assisting with Check Sampling — April 2012<br />

12.3 Quality Control and Quality Assurance (QAQC)<br />

12.3.1 <strong>Apogee</strong> Programs 2006 – 2012<br />

The <strong>Apogee</strong> drilling programs covered in the October 2011 mineral resource estimate by<br />

Mercator occurred between 2006 and July of 2011, with the last drill hole included in that<br />

resource being PUD214. QAQC results for the <strong>Apogee</strong> programs that contributed to the<br />

previous estimate were presented by Cullen et al. (2012) and the discussions presented<br />

below that pertain to these programs are taken directly from that source with a minimum of<br />

modification. QAQC results that pertain to oxide zone drilling carried out between July 2011<br />

and December 2011 by <strong>Apogee</strong> are also described below.<br />

<strong>Apogee</strong> Programs 2006 to 2012<br />

Drill core sampling carried out by <strong>Apogee</strong> during the 2006 through 2012 programs on the<br />

<strong>Pulacayo</strong> property were subject to a QAQC program administered by the company. This<br />

included submissions of blank samples, duplicate split samples of quarter core and half core,<br />

certified analytical standards, <strong>Apogee</strong> field standards and analysis of check samples at a<br />

third party commercial laboratory. Additionally, internal laboratory reporting of quality control<br />

and assurance sampling was monitored by <strong>Apogee</strong> on an on-going basis during the course<br />

of the project. Details of the various components are discussed below under separate<br />

headings.<br />

QAQC discussions for certified and in-house standards, blanks and duplicate splits pertaining<br />

to <strong>Apogee</strong> programs completed prior to January 2010 were previously disclosed in the Micon<br />

PEA (Pressacco et al. 2010) for <strong>Pulacayo</strong>. After review of these results, Mercator concurs<br />

with the opinion expressed by Micon that drill core sample data associated with the earlier<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!