07.05.2015 Views

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

<br />

<br />

Acceptance of the Public Consultation, on the month of December 2012. The <strong>Pulacayo</strong><br />

Mining <strong>Project</strong> has been endorsed for implementation by the 22 communities and two<br />

existing committees in the project area.<br />

Delivery of the <strong>Study</strong> of Environmental Impact Assessment - Specific Analytical (EEIA-AE)<br />

to the Ministry of Mining and Metallurgy as the first requirement for obtaining the<br />

environmental license of <strong>Pulacayo</strong> Mining <strong>Project</strong>. It is important to note that the<br />

authorization to be received will be updated in the future to process 1000 tons of ore per<br />

day.<br />

20.7 Social, Community and Cultural Aspects<br />

The Article 162 of the Regulations for the Prevention and Environmental Control (RPCA)<br />

indicates that at the stage of identification of impacts to be considered in an EEIA, a Public<br />

Consultation shall be organized to take into account comments, suggestions and<br />

recommendations of the public who may be affected by the implementation of the project, work or<br />

activity.<br />

In October of 2012 the socialization of the <strong>Pulacayo</strong> Mining <strong>Project</strong> was conducted, performing<br />

the query at 2 ayllus where the project <strong>Pulacayo</strong> Mining is located, within the ayllus, the query<br />

was made to 22 communities and two commissions, the detail of the commissions and<br />

communities visited is:<br />

a) Ayllu Aransaya: (Community Huanchaca, Comunity Tolapampa, Challa-Jankoyo, Totora<br />

K, Sivingani, Chifluyo, Ubina, Parkajsi, Arislaka, Vila Villque, Cerdas, Sullchi, Noel<br />

Mariaca, Calerias y Jamachuma)<br />

b) Ayllu Urinsaya: (Escara, Kulla, Lequepata, Jaruma, Chita, Oro Ingenio, Colchani y<br />

Chacala)<br />

Both in the socialization and in the process of Public Consultation, it was explained the scope of<br />

<strong>Pulacayo</strong> Mining <strong>Project</strong>, potential environmental impacts that could arise with the<br />

implementation of the mining operation and how these will be mitigated to prevent damage to the<br />

surrounding communities.<br />

In the public consultation process undertaken in December 14th of 2012, which has received the<br />

support of all the communities involved, having been present for validation the original authorities<br />

and authorities representing ayllus ministries and municipalities involved.<br />

20.8 Agreements with Institutions<br />

ASC Bolivia LDC has a joint venture agreement with Minera <strong>Pulacayo</strong> Cooperative Ltd. who is<br />

the lessee by the Mining Corporation of Bolivia (COMIBOL) of mining concessions <strong>Pulacayo</strong>,<br />

Galeria General, Porvenir and Huanchaca concessions where the <strong>Pulacayo</strong> Mining <strong>Project</strong> will<br />

operate.<br />

Under the joint venture agreement between ASC Bolivia LDC and <strong>Pulacayo</strong> Mining Cooperative<br />

Ltd., the incorporation of the Company <strong>Apogee</strong> Minerals Bolivia S.A. was agreed, having the<br />

express permission of the Cooperative and the Mining Corporation of Bolivia (COMIBOL).<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 253

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!